Getting a renovation permitted in New Orleans depends heavily on where your property sits. A shotgun in a historic district faces a different approval path than a raised house in a surrounding parish, and mixing those up costs real time. We check your property’s district status before writing your scope, figure out which approvals apply, and build the permit timeline into your project plan from day one — not as a surprise in week three.

The first question we answer is whether your property falls under Historic District Landmarks Commission (HDLC) review, Vieux Carré Commission (VCC) review, or standard Orleans Parish Safety and Permits review with no historic overlay. Each path has a different approval process, different documentation requirements, and a different timeline — HDLC and VCC reviews in particular can involve design review boards that meet on a set schedule, not on demand. We identify which category your property falls into before the scope is finalized, so the timeline we give you reflects reality rather than a best-case guess.

Standard permits, HDLC applications, and VCC applications each require different submittals — site plans, elevation drawings, material specifications, and in historic districts, documentation showing how the work preserves character-defining features. We prepare the specific package each review body expects, rather than a generic submission that gets bounced back for missing information. For projects in surrounding parishes outside Orleans, we work through that parish's own permitting office and process, which often differs meaningfully from the city's in both requirements and turnaround time.

Inspections booked late are one of the most common reasons a project stalls mid-construction. We book required inspections ahead of the trade work that depends on them — framing, electrical, plumbing rough-in — so the crew isn't standing idle waiting on a scheduling gap. If a re-inspection is needed, we handle the follow-up directly with the inspector, keeping paperwork and scheduling off your plate. This means fewer surprise delays, a more predictable timeline, and a crew that keeps moving instead of waiting on approvals you'd otherwise have to chase down yourself.
You’ll know upfront whether your project needs a standard permit or a historic district review, and roughly how long that review typically takes, before the scope and price are finalized. If your property is in an HDLC or VCC district, we handle the application and documentation directly — you won’t need to navigate that process yourself. Inspections are scheduled ahead of the work that depends on them, so delays from permitting don’t turn into delays in your kitchen or living room.
It depends on the specific neighborhood and sometimes the block — New Orleans’ historic district boundaries aren’t always obvious from the address alone. We check this for you before finalizing your scope, so you’re not guessing.
It can add time, since HDLC and VCC applications often go through a design review board on a set meeting schedule rather than same-day approval. We build that timeline into your project plan upfront so it doesn’t come as a mid-project surprise.
Yes. Each surrounding parish runs its own permitting process, and we work through the specific requirements of whichever parish your property is in.
We handle the correction and re-inspection scheduling directly with the inspector, and let you know what caused the issue and how it’s being resolved.